Skip to main navigation Skip to search Skip to main content

MEGAPIE project, experience of electromagnetic pumps operation in the swiss spallation neutron source

  • S. Dementjev*
  • , F. Groeschel
  • , N. Jekabsons
  • *Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

4 Citations (Scopus)

Abstract

The MEGAPIE project with the aim to design, build and operate a 1 MW liquid metal target in the SINQ facility (Swiss Spallation Neutron Source, Paul Scherrer Institute, Switzerland) was a key experiment on the way to experimental accelerator driven systems (ADS) for transmutation of nuclear waste and for the development of liquid metal spallation targets. The electromagnetic pump system for the target, consisting of two electromagnetic pumps and two flowmeters, was designed and fabricated at the Institute of Physics, University of Latvia (IPUL) in 2003-2004. ATEA (France) integrated the pumps into the target in the beginning of 2005. The assembled target was commissioned at PSI in the frame of the MEGAPIE integral test (MIT) at the end of 2005. The target was being irradiated in the SINQ during 18 weeks in August-December 2006 in the course of the MEGAPIE-SINQ experiment . It was one of the first high-power liquid metal targets coupled with a proton accelerator and operating in a spallation source under full-service conditions.

Original languageEnglish
Pages (from-to)279-288
Number of pages10
JournalMagnetohydrodynamics
Issue number3
DOIs
Publication statusPublished - 2008
Externally publishedYes

Fingerprint

Dive into the research topics of 'MEGAPIE project, experience of electromagnetic pumps operation in the swiss spallation neutron source'. Together they form a unique fingerprint.

Cite this