Timed discrete event control of a parallel production line with continuous output

  • Dmitry Gromov*
  • , Stephanie Geist
  • , Jörg Raisch
  • *Šī darba korespondējošais autors
  • Technical University of Berlin
  • Max Planck Institute for Dynamics of Complex Technical Systems

Zinātniskās darbības rezultāts: Nodaļa grāmatā/enciklopēdijā/konferences krājumā › Nodaļa grāmatā › Pētniecība › koleģiāli recenzēts

Kopsavilkums

This chapter presents an approach to formulate and solve certain scheduling tasks using timed discrete event control methods. To demonstrate the approach, it considers a special class of systems-a cyclically operated chemical plant with parallel reactors using common resources and a continuous output. This problem was motivated by a benchmark proposed within the EU Network of Excellence HYCON. In this chapter, two parallel reactors sharing resources as, e.g., reactants, hot steam, cool water, are considered. The reactors are discharged into a shared storage tank that has a continuous outflow. The plant is cyclically operated. For this hybrid system, the goal is to assure non-conflicting work of these reactors and to prevent over- and under-filling of the tank.

OriģinālvalodaAngļu
Publikācijas avota nosaukumsAnalysis and Design of Hybrid Systems 2006
IzdevējsElsevier Ltd
Lapas205-210
Lapu skaits6
ISBN (Drukātā versija)9780080446134
DOIs
Publikācijas statussPublicēts - 2006
Ārēji publicētsJā

Nospiedums

Uzziniet vairāk par pētniecības tēmām “Timed discrete event control of a parallel production line with continuous output”. Kopā tie veido unikālu nospiedumu.